PTO Self-priming roller pumps - series ML 20 - MLI 25 - MT 300 - MT 600
Le pompe Ferroni serie ML, MLI e MT sono le pompe più popolari per le attività agricole, Tutte le pompe sono autoadescanti ed a rullini che e si applicano direttamente alla presa di forza del trattore (PTO) senza l'utilizzo del cardano.
MT 600 PTO Roller PumpMT 600 Self-priming needle roller pump with 60 mm suction and 60 mm delivery connections. Made in Italy |
MT 300 PTO Roller PumpMT 300 Self-priming roller pump with 40 mm suction and 40 mm delivery connections. Delivery time: 1 week Made in Italy Delivery period: 1/2 working days |
MLI 25 PTO Roller PumpMLI 25 Self-priming needle roller pump with 30 mm suction and 19 mm delivery connections. Made in Italy Delivery period: 1/2 working days |
ML 20 PTO Roller pumpSelf-priming roller pump with 30 mm suction and 19 mm delivery connections. Made in Italy Delivery period: 1/2 working days |
ML 20 30-30 PTO Roller PumpSelf-priming roller pump with 30 mm suction connections and 30 mm delivery. Made in Italy product Delivery period: 1/2 working days |
|
Two-cylindeMASS compressor two-cylinder with chians and equipmentCODE MASS Compressor with chain and equipment Delivery period: 1/2 working days |
Product 2
The description for this product tells you about the most salient features of this offer.
165.00 €
*
|
Washing equipment for pump MT 300Washing equipement for MT 300 pump Delivery period: 1/2 working days |
Washing equipment for pump ML 20 e MLI 25Washing equipment for pumps ML 20 (code 0030.0401) and MLI 25 (code 0031.0411). Delivery period: 1/2 working days |
Product 1
The description for this product tells you about the most salient features of this offer.
62.00 €
*
Delivery period: 1/2 working days |
Watering equipment for pump MT 300Equipment for watering - transfer for MT 300 pump code 0001.0391 Made in Italy Delivery period: 1/2 working days |
Hose d.40 mm for pump MT 300Spiral hose aspiration / delivery d. 40 for pump MT 300 Price per meter Delivery period: 1/2 working days |
Hose d.30 mm for pump ML 20 and MLI 25Spiral hose aspiration / delivery d. 30 for pumps series ML 20 e MLI Price per meter Delivery period: 1/2 working days |
Delivery hose high pressure 19x27 mm - price per meterHose suitable for the delivery of water and compressed air where characteristics of lightness and flexibility are required. Particularly suitable for agriculture, construction, shipbuilding and naval industries. Technical features: operating pressure 20 bar / 60 bar burst pressure Delivery period: 1-2 working days |
Repair kit for pump ML 20 - MLI 25Repair kit for pump ML 20 - MLI 25 Delivery period: 1/2 working days |
Repair kit for MT 300 pumpRepair kit for MT 300 pump Delivery period: 1/2 working days |
|
Hose fitting 1" 1/2x40 mm for pump MT 300Hose fitting 1" 1/2x40 mm for pump MT 300 Delivery period: 1/2 working days |
Brass union 1"x30 mm - for pump serie ML - MLIBrass union 1"x30 mm for pumps serie ML and MLI. Delivery period: 1/2 working days |
Brass union 1"x30 mm - for pump serie ML - MLIBrass union 3/4"x19 mm for pumps serie ML and MLI. Delivery period: 1/2 working days |
Brass jet for pumps serie MT 300Brass jet with hole d. 8.50 with hose connector d. 19 mm. The bass jet is for pump MT 300 (code 0001.0391). Delivery period: 1-2 working days |
Nylon roller for pump ML 20 - MLI 25 - spare partsNylon roller (mm 25x48) for pumps ML 20 - MLI 25 Delivery period: 1/2 working days |
Nylon roller for pump MT 300 - spare partsNylon roller (mm 25x57) for pump MT 300 Delivery period: 1/2 working days |
PTO Extension 1" 3/8" with quick button - lenght 150 mmPTO Extension 1" 3/8" with quick button - lenght 150 mm Delivery period: 1/2 working days |
Rotor for pump serie ML - MLICode RML.204 Spare parts - Rotor for pump series ML & MLI Delivery period: 1/2 working days |
|
Seal ring 45x60x7 with Inox springSeal ring 45x60x7 with Inox spring for pump ML 20 - MLI 25 - MT 300 - MT 600 Delivery period: 1/2 working days |
Spacer ring for FERRONI PumpsSpacer ring for the pumps ML 20 - MLI 25 - MT 300 - MT 600. Delivery period: 1/2 working days |
Roller bearing for FERRONi pumps - orginal spare partsRoller bering for pumps ML 20 - MLI 25 - MT 300 - MT 600. Delivery period: 1/2 working days |
Set valve for pump MLI 25 FERRONICode RML.228 Spare parts - Set valve for pump MLI 25 FERRONI Delivery period: 1/2 working days |
Nylon filter for pump MT 300Nylon filter for pump MT 300 Delivery period: 1/2 working days |
|
Repair kit for MT 600 pumpRepair kit for MT 600 pump Delivery period: 1/2 working days |
Spare Parts - FERRONI - Rotor for pump serie MT 300Code RMT.103 Spare parts - Rotor for pump series MT 300 Delivery period: 1/2 working days |
Nylon filter for pumps ML 20 and MLI 25Nylon filter for pumps ML 20 and MLI 25 Delivery period: 1/2 working days |
Abbacchiatore elettrico OLIVEST con prolunga telescopica MEDIAAbbacchiatore elettrico OLIVEST per la raccolta di olive con asta di prolunga telescopica da 1.45 a 2.25 metri. Made in ITALY Delivery period: 1-2 working days |